Posts by Mueller and Associates
Apogee of South Beach
Our firm oversaw full exterior restoration of this iconic building as the project manager and as the engineer of record. Many constraints surrounding the project regarding exterior access, metal door restoration and sealant use required specialty engineering skills. We provided the following services:
Read MoreThe Courts at South Beach 101 Alton Road
Our firm performed water infiltration investigation, on site investigation, preparation of construction documents as required to waterproof terraces, replace roofing, miscellaneous sealant repairs and replacement expansion joints. In addition MA oversaw construction of the projects. We provided the following services:
Read More6000 Indian Creek Drive
Our firm oversaw full exterior restoration of this iconic slender building structure as the engineer of record and Florida Licensed Special Inspector. Due to the slenderness of the building structure restoration of the exterior was a major structural achievement, in terms of Post Tensioning Cable & Shear Heads repair / replacement. We provided the following…
Read More2020 PONCE DE LEON BOULEVARD
Our firm oversaw waterproofing replacement at the main 8th and penthouse level terraces. Both terraces wrap the entire building and are infiltrating into the commercial spaces causing excessive interior damages. In addition leak investigation was completed at the north penthouse level main window and corrective actions were outlined for the building in taking corrective action.…
Read More1676 James Street
Our firm and oversaw construction of the 40 Year, Structural Restoration work at the property. The Building is historical to Miami Beach and our structural engineering expertise had to be utilized in restoration the front parapet extended eyebrow. We provided the following services:Â
Read MoreMezzanine Floor Slab Infill 50 East Chestnut Avenue
Our firm in a joint effort with Box Studios Architects teamed up to modify the first and second floor retail space of an existing high rise, concrete framed building. Design considerations required structural analysis of existing concrete columns and footings of building previously designed by Halverson Partners Structural. JBS properties the owner of the space…
Read More1300 PONCE DE LEON CONDOMINIUM
Our firm designed and oversaw exterior restoration of the building exterior. Key elements of the restoration project was the decorative corner quoins, many of which were not properly anchored to the back up and the large number of post tension cable pockets – never completed by the developer of the building. We provided the following…
Read MoreConcrete Parking Garage Restoration
Our firm provided professional engineering services as required to restore the upper and lower level parking decks and ramps associated with the building parking garage. Water infiltration, multiple layers of existing waterproofing, planter boxes and the severity of concrete deterioration prompted the need for specialized concrete restoration program in order to extend the life of…
Read MoreEdgewood Valley Country Club 7500 Willow Springs Road Building Addition/Modification
Our firm in a joint effort with Randy B. Pruyn NCARB AIA teamed up to design addition to an existing 100 year old masonry structure. Special foundation underpinning conditions proved to be a challenge, as the existing building foundations were comprised of large stone rubble. Other building modifications included the addition of an elevator, second…
Read MoreStructural Renovation / Modification AJ Lindemann & Hoverson Co. Building
Our firm provided complete interior and exterior structural engineering services for re development of existing deteriorated Chicago Landmark Building. We provided the following services: Other Service later followed:
Read More